Settlement of Carine: Asphalting of streets with a total width of 400 meters is underway
Works on the modernization of the road network in the Rožaj settlement of Carine are underway. The asphalt curtain is installed in two connected streets, the total length of which is 400 meters and the width is five meters. Asphalting is...